Mid-Atlantic Mixed Use Building

Mid Atlantic, USA

Perry Ruta

Construction | Dr. Asadi

Mixed-Use Building

Mid Atlantic, United States

Welcome

The Mid-Atlantic Mixed Use Building contains 54 levels of retail and residential space. The building is composed of a nine story podium that breaks into three towers, A1, A2 and A3, that are 32, 25, and 13 stories. The Mid-Atlantic Mixed Use Building is expected to take 3 years of construction and have a final cost of $330 million dollars.

About the Site

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.

News Feed

April 17, 2019

April 1, 2019

April 1, 2019

March 20, 2019

January 14, 2018

December 7, 2018

Final CPEP Review

December 7, 2018

October 17, 2018

Breadth Topic Proposals

October 15, 2018

Bill Moyer Lecture

October 1, 2018

PACE Roundtable Discussion

November 6-7, 2018

Attend Kudroff Lecture

September 14, 2018

Attend Breadth Topic Lecture

September 14, 2018

September 14, 2018

September 12, 2018

September 10, 2018

September 4, 2018

Resume Posted on CPEP

August 31, 2018

August 20, 2018

Bio Sketch Peer Review & Correction

August 1, 2018

July 31, 2018

CPEP Seminar

July 27, 2018

CPEP Full Menu Functionality

July 23, 2018

CPEP Home Page

July 23, 2018

Building Statistics 1 - Draft

August 31, 2018

Project Initation Checklist Pt. 1

August 20, 2018

Master List Information Updated

August 1, 2018

Project Documentation

July 31, 2018

AE Department Thank You Letter

July 27, 2018

Sent Thank You to Owner

July 23, 2018

Owner Permission Received

July 23, 2018

CPEP Site Complete & Ready for Review

bottom of page